| Title: | High Integrity C&I Systems |
| Subtitle: | Survey and Review of High Integrity Safety Related C&I Systems |
| Client: | British Nuclear Fuels |
High integrity C&I Systems were reviewed at Sizewell A Power Station to verify that cabling terminations met the required standard for the remaining operational life of the Station. We produced a report which summarised the findings and made recommendations to continue checks within the existing maintenance regime.